当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In general for this step, the geotechnical PMP team member completes, or arranges for the completion, of the geotechnical report for the project, and assists the team in the development of contract documents needed to construct the project. In the case of design-build projects, see WSDOT GDM Chapter 22 regarding the de是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In general for this step, the geotechnical PMP team member completes, or arranges for the completion, of the geotechnical report for the project, and assists the team in the development of contract documents needed to construct the project. In the case of design-build projects, see WSDOT GDM Chapter 22 regarding the de
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
在一般的这一步骤,PMP的土力工程团队成员完成,或安排完成,土力工程报告的项目,并协助团队在发展所需的合同文件为修建项目。 在这种情况下的设计构建项目,请参见22章wsdot GDM对交付文件。
  • 匿名
2013-05-23 12:24:58
一般为这步,土质技术的PMP队员为完成,土质技术的报告在合同的发展完成或者安排为项目,并且协助队提供需要修建项目。 在情况下设计修造项目,看WSDOT GDM第22章关于需要的deliverables。
  • 匿名
2013-05-23 12:26:38
一般对于此步骤,岩土 PMP 团队成员完成,或安排完竣,岩土工程报告的项目,并协助团队的发展为建设项目所需的合同文件。在设计建造项目,看到美国华盛顿州运输局 GDM 章 22 关于所需的可交付结果。
  • 匿名
2013-05-23 12:28:18
通常对这个步骤,地理技术 PMP 队员完成,或商定完成,项目的地理技术报告中,帮小组做被需要建造项目的合同文件的发展。在设计建造的项目的情况下,看 WSDOT GDM 第 22 章关于可交付使用需要。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭