当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This design manual mainly introduced the Chun Zai village to the Lao Guan Miao section of highway route design process. According to the given data, through the analysis of the original data, and the section of geology, topography, terrain, hydrology and other natural conditions, completed in the teacher\'s guidance an是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This design manual mainly introduced the Chun Zai village to the Lao Guan Miao section of highway route design process. According to the given data, through the analysis of the original data, and the section of geology, topography, terrain, hydrology and other natural conditions, completed in the teacher\'s guidance an
问题补充:

  • 匿名
2013-05-23 12:21:38
本设计手册主要介绍了骏哉村公路路线设计过程老挝管眯岙部分。
  • 匿名
2013-05-23 12:23:18
这种设计手册》主要是介绍了春ZAI村_____喳__的老挝苗族部分高速公路的设计过程。 根据给定的数据,通过分析的原始数据,该部分的地质、地形、地形、水文和其他自然条件下,完成了在教师的指导和帮助的学生。
  • 匿名
2013-05-23 12:24:58
这个设计指南主要介绍了春Zai村庄给高速公路路线设计过程的老挝人Guan Miao部分。 根据特定数据,通过对原始的数据的分析和地质、地势、地形、水文学和其他自然情况的部分,完成在老师\ ‘s学生教导和帮助。
  • 匿名
2013-05-23 12:26:38
本设计说明书主要介绍了公路路线设计过程的老关庙节春仔村。根据给定的数据,通过分析的原始数据和地质、 地貌、 地形、 水文及其他自然条件,在 teacher\ 的指导和帮助学生完成部分。
  • 匿名
2013-05-23 12:28:18
这本设计手册主要将陈 Zai 村庄介绍给高速公路路线设计过程的老挝 Guan Miao 部分。通过原始数据的分析,根据特定数据,以及地质概况, topography,地形, hydrology 和在学生的 teacher\ 的指导和帮助方面完成的其他自然条件的部分。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭