当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The estimated cost of storing each information media per month, at all locations, includes labor, secure containers, and excluding processing time to take it in and out of storage, e.g., unlock the container, sign the container open-close sheet as open, lock the container, and sign it as closed, and是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The estimated cost of storing each information media per month, at all locations, includes labor, secure containers, and excluding processing time to take it in and out of storage, e.g., unlock the container, sign the container open-close sheet as open, lock the container, and sign it as closed, and
问题补充:

  • 匿名
2013-05-23 12:21:38
每月存储每个信息媒体的估计成本,在所有地点,包括劳动,安全容器,不包括处理时间把它和出入库,如解锁容器,签署容器开闭片开放,
  • 匿名
2013-05-23 12:23:18
被估计的费用的介质存储每个信息每月在所有地点,包括劳动、安全货柜,但不包括处理时间以使它的存储,例如,解锁该树枝,树枝登录打开关闭打开的表,锁定该树枝,并签名为"关闭",
  • 匿名
2013-05-23 12:24:58
存放每信息介质的估计成本每个月,在所有地点,包括劳方,巩固容器,并且排除处理时间采取它进出存贮,即,打开容器,签署容器打开关闭板料如开放,锁容器,并且签署它如被关闭,和
  • 匿名
2013-05-23 12:26:38
估计存储成本的每月,每个信息媒体在所有地点,包括劳动、 安全的容器内,和排除处理时间把它和存储,例如,解锁容器、 签署容器打开关闭表作为开放、 锁定在容器内,并签字,因为封闭,和
  • 匿名
2013-05-23 12:28:18
每月存储每信息媒介的被估计的费用,在所有位置,包括劳动,安全容器,不包括处理时间欺骗它和在存储外,例如,开启容器,标志容器坦率亲密的单子如打开,锁容器,签署它如关闭,
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭