当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:excavation, joining and fixing as specified and all necessary fittings, valves, elbows, bends, tees, junctions, backfilling, compacting, reinstatement of ground surfaces, landscape, floor finishing, etc; and providing all necessary accessories in compliance with specifications and authorities' requirements.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
excavation, joining and fixing as specified and all necessary fittings, valves, elbows, bends, tees, junctions, backfilling, compacting, reinstatement of ground surfaces, landscape, floor finishing, etc; and providing all necessary accessories in compliance with specifications and authorities' requirements.
问题补充:

  • 匿名
2013-05-23 12:21:38
开挖,连接和固定的规定,所有必要的配件,阀门,弯头,弯管,三通,路口,回填,压实,地面面,景观,楼层整理,恢复等;
  • 匿名
2013-05-23 12:23:18
挖掘、加入和固定,所有必要配件、阀门、弯头、弯管、三通连接,回填工程,压缩、恢复的凹凸不平的地面、景观、楼修整等;并提供所有必要的附件符合规格和当局的要求。
  • 匿名
2013-05-23 12:24:58
挖掘,加入和固定作为指定的和所有必要的配件、阀门、手肘、弯、发球区域,连接点,重新填没,地面表面的变紧密,复原,风景、地板精整等等; 并且提供所有必要的辅助部件依从规格和当局的要求。
  • 匿名
2013-05-23 12:26:38
开挖,加入和固定作为指定和所有必要的配件、 阀门、 弯头、 弯、 三通、 路口、 回填、 压实、 复职的地面表面、 景观、 地板整理等;并提供所有必要配件符合规格和当局的要求。
  • 匿名
2013-05-23 12:28:18
挖掘,加入和固定如指定和所有必要试穿,阀门,用肘推,弯曲,准备发球,汇合处,覆土于,压缩,地的 复职公开化, 风景,结束的地板,等等;以及与规格和当局的要求一致提供所有必要 附件。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭