当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Optimally, the BIM model should be able to serve all deliverables during the entire building project lifecycle. There are various levels and depths to creating 3D building models starting from mass models used for schematic design through 3D models created for visualization purposes to intelligent “real” building infor是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Optimally, the BIM model should be able to serve all deliverables during the entire building project lifecycle. There are various levels and depths to creating 3D building models starting from mass models used for schematic design through 3D models created for visualization purposes to intelligent “real” building infor
问题补充:

  • 匿名
2013-05-23 12:21:38
理想情况下,该模型BIM应能在整个建筑项目生命周期过程中,为所有交付。
  • 匿名
2013-05-23 12:23:18
优化、博尔茨曼所促进会模型应能够为所有可交付结果在整个建设项目的整个生命周期。 有各种不同的层面和深度,创建3D建筑模型从开始大规模使用的模式设计原理图的通过3D模型的可视化目的创建智能"真正的"建筑信息模型。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
优选地,BIM 模型应该是能够为所有可交付结果服务在整个期间建设项目生命周期。有各种级别和创建三维建筑模型从质量模型用于通过为智能"真实"的建筑信息模型可视化目的创建的 3D 模型的原理图设计的深度。虽然创建可视化模型只包含不多的 3D 几何和现实陈述的建设所需的材料说明,真正的 BIM 模型,除了几何,也蕴含着丰富的必要协调、 文档、 列表的其他信息和管理建设基于其智能的 BIM 模型。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭