|
关注:1
2013-05-23 12:21
求翻译:疏浚工程师研制的矿沙疏浚工程船,前置绞刀,以保证清淤浓度,远距离输送,在有效工作时间内从河内挖出的固体物含沙量很高,浓度高,工作效率高,带给客户超出能力的挖沙效率。并且我们的公司在挖沙同时也为保护生态环境有一套自己的整体方案。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
疏浚工程师研制的矿沙疏浚工程船,前置绞刀,以保证清淤浓度,远距离输送,在有效工作时间内从河内挖出的固体物含沙量很高,浓度高,工作效率高,带给客户超出能力的挖沙效率。并且我们的公司在挖沙同时也为保护生态环境有一套自己的整体方案。
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
Dredging engineers developed the ore dredging ships, the built-in twisted pair, to ensure that the blockage concentration, long-distance transport, the effective working time in Hanoi from digging up the solids with Gaza is very high, high concentrations, high efficiency, and gives the customer exce
|
|
2013-05-23 12:24:58
Scours the ore sand which engineer develops to scour the engineering ship, the pretage reamer, guaranteed the clear silt density, the remote transfer, the solid silt content which digs out from Hanoi is very high in the effective duration, the density is high, the working efficiency is high, takes t
|
|
2013-05-23 12:26:38
Dredge engineers develop mineral sand dredging ship, front-mounted reamers to ensure silt concentrations, transmitted over a long distance, in the effective working time of solids removed from the Hanoi high sediment, concentration, high efficiency to customers beyond the capacity of dredging effici
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区