|
关注:1
2013-05-23 12:21
求翻译:8.1 Material using for the A1 building construction such as deform bars, concrete, cement and Archi material the time of handing over the first party will caculate. Any extra material used by second party must compensate the first party. The rebar wastage 0.3%.是什么意思?![]() ![]() 8.1 Material using for the A1 building construction such as deform bars, concrete, cement and Archi material the time of handing over the first party will caculate. Any extra material used by second party must compensate the first party. The rebar wastage 0.3%.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区