|
关注:1
2013-05-23 12:21
求翻译:The Busan – Geoje Fixed Link will provide a road connection between the metropolis of Busan and Geoje Island. The Link comprises amongst others two cable stayed bridges and an under water tunnel constructed as a concrete immersed tube tunnel.The immersed tunnel has a number of special features: its length of 3,2 km, th是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The Busan – Geoje Fixed Link will provide a road connection between the metropolis of Busan and Geoje Island. The Link comprises amongst others two cable stayed bridges and an under water tunnel constructed as a concrete immersed tube tunnel.The immersed tunnel has a number of special features: its length of 3,2 km, th
问题补充: |
|
2013-05-23 12:21:38
釜山 - 巨济固定链接将提供釜山和巨济岛的大都市之间的道路连接。
|
|
2013-05-23 12:23:18
釜山-庆南巨济市固定链接将提供一条公路连接的大都会之间的釜山和庆南巨济市。 链接由两个斜拉桥接器和一个水下的隧道沉管隧道的具体通道。海底隧道有一些特殊的功能:它的长度的3公里,水深超过35m,严重的海洋条件下,软土和对齐约束。
|
|
2013-05-23 12:24:58
Busan - Geoje固定的链接将提供Busan大都会和Geoje海岛之间的路连接。 链接在其他之中包括二座缆绳被停留的桥梁和下面水隧道被修建作为一个具体被浸没的管隧道。被浸没的隧道有一定数量的特殊性能: 它的3,2公里、水深度的35 m,严厉海洋条件、软的底土和对准线限制的长度。 与项目的标度结合这些特点做设计和建筑隧道一个主要挑战。 它预计项目将开放新的天际为对被浸没的隧道技术的使用。 本文突出这些特殊性能并且集中仅民用和结构方面。
|
|
2013-05-23 12:26:38
釜山 — — 巨济固定的链接将提供釜山的大都市和巨济岛之间的道路连接。链接包括双索斜拉桥和水隧道混凝土沉的管隧道作为构造下。沉管的隧道有大量的特殊功能: 其长度 3.2 公里,水深超过 35 米,恶劣的海洋条件,软地基和对齐约束。与项目规模相结合这些特点使得设计和隧道施工中的一项重大挑战。预计项目将打开了新的视野,为沉管的隧道技术的使用。本文展示了这些特殊的功能,集中在土木及结构方面只。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区