当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The preliminary soil investigations indicated the tunnel. More detailed soil investigations during design showed an extension of the marine clay under the depressed seabed. More detailed soil investigations during design showed an extension of the marine clay under the depressed seabed. As a modification of the vertica是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The preliminary soil investigations indicated the tunnel. More detailed soil investigations during design showed an extension of the marine clay under the depressed seabed. More detailed soil investigations during design showed an extension of the marine clay under the depressed seabed. As a modification of the vertica
问题补充:

  • 匿名
2013-05-23 12:21:38
初步调查,土壤的指示隧道。
  • 匿名
2013-05-23 12:23:18
土壤的初步调查显示隧道。 更多详细的土壤调查设计过程中表现出的一个扩展的海洋粘土在压下海底。 更多详细的土壤调查设计过程中表现出的一个扩展的海洋粘土在压下海底。
  • 匿名
2013-05-23 12:24:58
初步土壤调查表明了隧道。 更加详细的土壤调查在设计期间显示了海洋黏土的引伸在沮丧的海底之下。 更加详细的土壤调查在设计期间显示了海洋黏土的引伸在沮丧的海底之下。 作为垂直的对准线的修改对一个更加深刻的位置,造成梯度6%不是一个选择为一项广泛的研究被执行为了探索技术选择克服问题的当局。 从变化从沙子击实堆的一定数量的选择,土壤混合后者的替换,预先输入和深水泥被选择了作为技术最适当和最经济的可接受的方法。 区域与DCM堆将是延长的在一个可观的距离在隧道的双方为了支持培养大约16 m在原始的海底之上,并且必须保护隧道免受股船和侵蚀的海底的堤防。
  • 匿名
2013-05-23 12:26:38
土层的初步调查表明,隧道。更详细显示扩展郁闷的海床下海洋粘土的设计过程中的土壤调查。更详细显示扩展郁闷的海床下海洋粘土的设计过程中的土壤调查。作为修改到更深的位置的垂直对齐方式,导致在渐变中的 6%不是选择当局为了探索的技术选项,以克服这一问题进行广泛的研究。从大量替代从挤密砂桩,换土,变预和深层水泥搅拌,后者已被选为技术的最适当和最经济可以接受的方法。深层搅拌桩的地区将会延长隧道两侧相当大的距离,以支持小组的海堤引发约 16 米以上的原始的海底,具有保护反对搁浅船舶和侵蚀隧道。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭