当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:On both ends of the tunnel existing islands are extended artificially to allow construction of the transition zone between the immersed tunnel and the approaches.To protect these reclaimed extensions, normally Tetrapods are used in Korea. Hydraulic model test performed at the Korean hydraulic institute Kordi showed tha是什么意思?

待解决 悬赏分:1 - 离问题结束还有
On both ends of the tunnel existing islands are extended artificially to allow construction of the transition zone between the immersed tunnel and the approaches.To protect these reclaimed extensions, normally Tetrapods are used in Korea. Hydraulic model test performed at the Korean hydraulic institute Kordi showed tha
问题补充:

  • 匿名
2013-05-23 12:21:38
在隧道的两端存在的岛屿人为地延长,使施工沉管隧道和approaches.To保护这些回收扩展之间的过渡地带,通常是四足动物在韩国使用。
  • 匿名
2013-05-23 12:23:18
在隧道的两端延长现有岛屿是人为地使建筑的过渡区的海底隧道之间的方法.为了保护这些填海工程扩展,通常使用tetrapods在大韩民国。 水力模型试验在韩国液压研究所tetrapods遗体表明,与一个重量的50,60和70吨的需要。
  • 匿名
2013-05-23 12:24:58
在隧道的两个末端现有的海岛人为地被延伸允许转折区域的建筑在被浸没的隧道和方法之间。要保护这些被索还的引伸, Tetrapods通常用于韩国。 水力模型试验执行在韩国水力学院Kordi表示, Tetrapods与重量50, 60和70吨是需要的。
  • 匿名
2013-05-23 12:26:38
隧道两端现有群岛是人工期限延长,以便施工沉管的隧道与方法之间的过渡地带。为了保护这些再生的扩展,通常四足动物使用在韩国。在韩国液压研究所研究院进行水工模型试验表明,四足动物与 50、 60 和 70 吨的重物需要。
  • 匿名
2013-05-23 12:28:18
在隧道的终端上现有岛人造地被提供允许被沉浸的隧道和 approaches.To 之间的过渡区域的建造保护这些被改造的扩大,通常 Tetrapods 用于朝鲜。水力的模型测试在朝鲜水力的学院 Kordi 执行显示对一重量 50, 60 和 70 吨的 Tetrapods 需要。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭