当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Tribunal Member resolved to set the decision of EGSC aside(thus no permit to be issued). The main ground for this decision was that the design response to deal with projected sea-level rise –raising the sensitive use areas of the development to above the projected flood and sea-level rise levels – was insufficient.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Tribunal Member resolved to set the decision of EGSC aside(thus no permit to be issued). The main ground for this decision was that the design response to deal with projected sea-level rise –raising the sensitive use areas of the development to above the projected flood and sea-level rise levels – was insufficient.
问题补充:

  • 匿名
2013-05-23 12:21:38
法庭成员决定设置EGSC决定搁置(因此没有颁发许可证) 。
  • 匿名
2013-05-23 12:23:18
审裁处成员解决的决定,设置的委员会负责督导电子政府计划放在一边(因此没有发放许可证)。 主要理由是,这项决定的设计对策来应付预计海平面上升-提高敏感区发展的上述预测洪水和海平面上升一级,是不够的。
  • 匿名
2013-05-23 12:24:58
法庭成员被解决设置EGSC决定在旁边(因而没有许可证被发布)。 主要地面为这个决定是对成交的设计反应以计划的海平面上升-提高发展的敏感用途范围对在计划的洪水和海平面上升水平之上-是不足的。 法庭成员发现了它是“过分单纯和最后一种引入歧途的方法” (p.16) 为一定数量的原因包括: 土地利用、恶劣的通入、不能接受的风险和无能的激化在将来访问服务。 法庭成员结束了:
  • 匿名
2013-05-23 12:26:38
审裁处成员决心设置的决定负责督导一边 (因此没有许可证时)。这一决定的主要理由是发展的,设计应急措施来应付预计海平面上升 — — 提高到预计的洪水和海平面上升水平之上敏感的使用领域 — — 是发展的不足。审裁处成员发现它是"简单化和最终是一个错误的方法"(第 16 页) 有好几个原因,包括: 土地的集约化使用,难以获得,不能接受的风险,并无法访问服务在未来。审裁处成员的结论:
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭