当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Phase I efforts focused on butt weld baseline, inspections using the VT, PT, MT and UT. The first and major step in baselining NDE capabilities was that of producing representative test specimens. A unique set of specimens was produced by cutting sections containing butt welds from retired tank cars, and initiating tig是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Phase I efforts focused on butt weld baseline, inspections using the VT, PT, MT and UT. The first and major step in baselining NDE capabilities was that of producing representative test specimens. A unique set of specimens was produced by cutting sections containing butt welds from retired tank cars, and initiating tig
问题补充:

  • 匿名
2013-05-23 12:21:38
第一阶段的工作重点是对焊基准,采用VT , PT , MT和UT检查。
  • 匿名
2013-05-23 12:23:18
第一阶段工作的重点是对缝焊接基准,检查使用VT,pt,MT和UT。 第一个和主要步骤nde的基线功能是制定代表测试样品。 唯一的一组的标本是由切割部分载有对接焊缝油箱汽车从退休,并开始严密封闭疲劳裂纹沿焊接在散热受影响的区域。
  • 匿名
2013-05-23 12:24:58
阶段I努力集中于对接焊基础线、检查使用VT, PT、MT和UT。 第一和主要步在baselining NDE能力是那导致代表性测试标本。 独特的套标本是通过削减包含对接焊由退休的坦克车和紧紧创始闭合的疲劳裂纹沿焊接的部分导致的在热影响区。
  • 匿名
2013-05-23 12:26:38
第一阶段的努力集中在对接焊缝基线检查使用的 VT、 PT、 MT、 ut.基线无损检测能力的第一次的主要步骤是生产代表性试样。一套独特的标本,制得含退休的油罐车,从对接焊缝的切割部分和启动紧闭的疲劳裂纹沿焊缝的热影响区。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭