当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:水利水电机电设备安装工程、机电设备安装工程、110KV及以下送电线路和同电压等级变电站工程的施工、安装和调试,以及相关活动的环境、职业健康安全管理是什么意思?

待解决 悬赏分:1 - 离问题结束还有
水利水电机电设备安装工程、机电设备安装工程、110KV及以下送电线路和同电压等级变电站工程的施工、安装和调试,以及相关活动的环境、职业健康安全管理
问题补充:

  • 匿名
2013-05-23 12:21:38
Environmental Water Conservancy and Hydropower mechanical and electrical equipment installation engineering, construction and mechanical equipment installation engineering , 110KV and below power transmission lines and substations with voltage level engineering , installation and commissioning , as
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
The water conservation water and electricity electromechanical device the installation work, the electromechanical device the installation work, 110KV and following power transmission sequence and with the voltage rank transformer substation project construction, the installment and the debugging, a
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭