当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:There has to be poverty and social analysis during the pre-design and design phase with a report flagging off the safeguard issues, followed by stakeholder participation and consultation, the feedback of which should form the final project report. The project implementation should have a joint communication plan and jo是什么意思?

待解决 悬赏分:1 - 离问题结束还有
There has to be poverty and social analysis during the pre-design and design phase with a report flagging off the safeguard issues, followed by stakeholder participation and consultation, the feedback of which should form the final project report. The project implementation should have a joint communication plan and jo
问题补充:

  • 匿名
2013-05-23 12:21:38
必须有前期设计和使用报表标记过的保障问题,其次是利益相关者的参与和协商设计阶段期间贫困和社会分析,反馈,应该形成最终项目报告。
  • 匿名
2013-05-23 12:23:18
有贫穷和社会分析的预设计和设计阶段关闭标记的报告的保障问题,随后是各利益相关者的参与和协商下进行,其反馈的应是项目的最后报告。 该项目的实施应该有一个共同交流计划和联合执行和监测机制。
  • 匿名
2013-05-23 12:24:58
必须有贫穷,并且社会分析在期间前设计和设计阶段以下垂保障问题,跟随由赌金保管人参与和咨询,反馈的报告,其中应该形成最后的项目报告。 项目实施应该有一个联合通讯设备计划和联接实施和监视机制。
  • 匿名
2013-05-23 12:26:38
必须有标记的保障问题,其次是利益相关者参与的一份报告预设计和设计阶段的贫穷和社会分析和咨询,其中反馈应该形成最终项目报告。该项目的实施应该有一个联合通信计划和联合执行和监测机制。
  • 匿名
2013-05-23 12:28:18
在那里必须是贫穷和在有从保护者的一条报告石板路的设计前和设计阶段期间的社会分析发行,接着是赌金保管人参与和咨询,对哪个应该形成最后项目报告的反馈。项目执行应该有一个联合通信计划和联合执行和监测机制。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭