|
关注:1
2013-05-23 12:21
求翻译:S&S will supply the loads that will be put on to the foundation and the Foundation Layout drawing. Upon receiving the load information and layout, the tower foundation should be designed by the park’s engineer. All of the foundation information contained in this document needs to be coordinated with the requirements se是什么意思? 待解决
悬赏分:1
- 离问题结束还有
S&S will supply the loads that will be put on to the foundation and the Foundation Layout drawing. Upon receiving the load information and layout, the tower foundation should be designed by the park’s engineer. All of the foundation information contained in this document needs to be coordinated with the requirements se
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
S&S将提供负载,将在基金会和基金会布局图。 在收到信息加载和布局、塔基础设计应由公园的工程师。 所有的基金会的这份文件所载的信息需要进行协调的要求,在规定的基础设计提供的计划的公园的工程师。
|
|
2013-05-23 12:24:58
S&S将供应将被投入对基础和基础布置图的装载。 在接受装载信息和布局,应该由公园的工程师设计塔基础。 在本文包含的所有基础信息需要协调以在基础设计规划指出的要求提供由公园的工程师。
|
|
2013-05-23 12:26:38
S 与 S 将提供将放到地基和基础布局绘图的负载。在收到负载信息和布局,应由公园的工程师设计铁塔基础。所有载于本文件的基础信息需要与公园的工程师提供的基础设计方案的要求进行协调。
|
|
2013-05-23 12:28:18
S&S 将提供将被提出的负荷上到基础和基础布局素描。在收到负荷的信息和布局上,塔基础应该被公园的工程师设计。所有基础信息容纳在这份文件中需要以在基础图样中被阐明的需求是协调的制定计划由公园的工程师提供。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区