|
关注:1
2013-05-23 12:21
求翻译:2.6. No later than two weeks from completion of design and detailing, supplier shall provide recommended spare parts for proposed equipment, controls, and part-touching tooling. This list should include manufacturer’s names, part numbers, and itemized costs. Tier II supplier parts lists must also be included. See AA是什么意思?![]() ![]() 2.6. No later than two weeks from completion of design and detailing, supplier shall provide recommended spare parts for proposed equipment, controls, and part-touching tooling. This list should include manufacturer’s names, part numbers, and itemized costs. Tier II supplier parts lists must also be included. See AA
问题补充: |
|
2013-05-23 12:21:38
2.6 。
|
|
2013-05-23 12:23:18
2.6*后两个星期内完成的设计和详细说明,供应商应提供建议的备件为建议的设备、控制和零件的触摸工具。 此列表应包括制造商名称、零件号和明细成本。 第二层供应商零件列表也必须包括在内。 请参阅AAM设备规格手册,第8款. (3)三个部分的详细资料,必须触摸设备提供的AAM功能。
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
2.6.不迟于两个星期完成的设计和细节,供应商应提供推荐的备件为拟议的设备、 控件和部分非接触式模具。 此列表应包括制造商的名称、 部件号和分项的成本。 层第二供应商零件列表还必须包括在内。 请参阅 AAM 设备规范手册,部分 8。(3) 三套部分感人细节必须交付到 AAM 设施设备。
|
|
2013-05-23 12:28:18
2.6.不迟于距设计的完成二星期以及详细说明,供应商将提供被推荐的零件用于拟议的设备,控制,部分动人使用工具。这份列表应该包括制造商的名字,部分数字,逐条列出费用。阶层 II 份供应商部分列表必须也被包括。看 AAM 设备规格手册,第 8 节。(3) 三套部分动人的详细信息
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区