|
关注:1
2013-05-23 12:21
求翻译:Following the acceptance of rails 4.579371.Q with 105 holes pitch we could update the frame 4.579362.P to reduce the quantity of M12 holes from 102 to 52 (26+26), removing each second hole as shown in attachment.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Following the acceptance of rails 4.579371.Q with 105 holes pitch we could update the frame 4.579362.P to reduce the quantity of M12 holes from 102 to 52 (26+26), removing each second hole as shown in attachment.
问题补充: |
|
2013-05-23 12:21:38
下列导轨的接受4.579371.Q与105孔间距我们可以更新帧4.579362.P减少M12孔的数量从102到52( 26 + 26)中,去除每个第二孔中所示的附件。
|
|
2013-05-23 12:23:18
以下的滑轨的接受4.579371.Q105孔间距我们可以更新框架4.579362.P减少数量的M12孔内,从102到52(26 26),卸下每个第二个孔附件中所示。
|
|
2013-05-23 12:24:58
在路轨以后4.579371.Q采纳与105个孔沥青我们可能更新框架4.579362.P使M12孔降低的数量从102到52 (26+26),去除每个第二个孔如附件所显示。
|
|
2013-05-23 12:26:38
之后的 rails 验收与 105 4.579371.Q 孔距我们可以更新帧 4.579362.P 减少到 52 (26 + 26),从 102 个 M12 孔数量删除每个第二个孔,如附件所示。
|
|
2013-05-23 12:28:18
随着横档的接受具 105 个孔的 4.579371.Q 我们可以更新的球场框架减少数量的 M12 的 4.579362.P 从 102 至 52 打洞 (26 +26),如附件所示撤销每个第二孔。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区