求翻译:Where the CONTRACTOR provides equipment that is not covered by the testing procedures contained within section 6.0 they are to provide a detailed Integrated Factory and Site Acceptance Test Procedure for review and approval. The procedure is to be submitted in accordance with the project schedule or at least 2 months p是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Where the CONTRACTOR provides equipment that is not covered by the testing procedures contained within section 6.0 they are to provide a detailed Integrated Factory and Site Acceptance Test Procedure for review and approval. The procedure is to be submitted in accordance with the project schedule or at least 2 months p
问题补充:

  • 匿名
2013-05-23 12:21:38
承揽人提供不包括包含在6.0节的测试程序,设备,他们都提供了详细的综合厂和现场验收测试程序进行审查和批准。
  • 匿名
2013-05-23 12:23:18
在承包者提供设备,不包括在测试过程中所载第6他们是要提供一个详细的综合工厂和现场验收测试程序,以审查和批准。 该过程将按照提交的项目计划或至少2个月前开始的测试。
  • 匿名
2013-05-23 12:24:58
那里承包商提供没有由在包含的试验过程包括第6.0部分内他们的设备是为回顾和认同提供一个详细的联合工厂和站点验收试验做法。 做法将递交与项目日程表或至少2个月符合在开始测试之前。
  • 匿名
2013-05-23 12:26:38
在承包者提供不受测试的程序包含在节 6.0 他们是提供详细的综合工厂和现场验收测试程序审查和批准的设备。程序是按照项目时间表或至少 2 个月的测试开始前提交。