当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Rigging plan is also required while a higher installation elevation of equipment or more interferences with other existing objects may exist. Equipment weight shall be referred for calculating working radius, boom length to determine the type of the crane. If required, small structure component or piping shall 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Rigging plan is also required while a higher installation elevation of equipment or more interferences with other existing objects may exist. Equipment weight shall be referred for calculating working radius, boom length to determine the type of the crane. If required, small structure component or piping shall
问题补充:

  • 匿名
2013-05-23 12:21:38
索具计划,而设备或更多的干扰与其他现有对象更高海拔的安装可能存在也是必需的。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
虽然可能存在的设备或与其他现有的对象更多干扰的安装高程较高,索具计划也是需要的。设备重量须计算工作半径,繁荣的长度来确定起重机的类型。 如果需要,应拆除小结构构件或管道,确保设备安全的提升。
  • 匿名
2013-05-23 12:28:18
索具计划也需要当设备的一次更高的安装晋升或更多干涉拿着其他现有物体可能存在。设备重量将为了计算工作半径被参考,确定 起重机的类型的繁荣时期的长度。如果 要求, 小结构组件 或 管道系统 将 是被拆除的 确保设备的 是安全升起。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭