当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:结合唐山跨纳潮河大桥跨海高桩承台的施工情况,从设计、拼装、下沉、堵漏、浇注封底混凝土及钢吊箱等工序,对高桩钢吊箱施工技术作了详细的介绍。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
结合唐山跨纳潮河大桥跨海高桩承台的施工情况,从设计、拼装、下沉、堵漏、浇注封底混凝土及钢吊箱等工序,对高桩钢吊箱施工技术作了详细的介绍。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Tangshan combined across tide, the bridge on the river crossing high piling contractors for construction, from design, assembling, sink, blocking, gate back concrete and steel swivel chassis operations, such as the high-pile steel swivel chassis construction technology made a detailed presentation.
  • 匿名
2013-05-23 12:24:58
Unifies Tangshan cross to accept the Chaohe River big bridge span sea high relieving-type platform supported on piles the construction situation, from the design, assembling, the submersion, stops up leaks, the casting back cover concrete and the steel hangs working procedures and so on box, hung th
  • 匿名
2013-05-23 12:26:38
Tangshan na Chao River-spanning bridge across high pile bearing platform construction, design, assembling, sinks, leakage, pouring subsealing concrete and steel processes, high pile cofferdam construction technique introduced in detail.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭