当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Combination of Tangshan transadmittance Chaohe River bridge pile cap construction, from the process design, assembling, sink, plugging, pouring and bottom sealing concrete and steel hanging box and the high Zhuanggang hanging box construction technique were introduced in detail.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Combination of Tangshan transadmittance Chaohe River bridge pile cap construction, from the process design, assembling, sink, plugging, pouring and bottom sealing concrete and steel hanging box and the high Zhuanggang hanging box construction technique were introduced in detail.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
结合唐山锦江贵宾楼transadmittance洪潮和河大桥施工桩帽,从流程设计、组装、散热器、堵塞、倾倒和底部密封混凝土和钢吊箱和高zhuanggang悬挂框结构技术,详细介绍了。
  • 匿名
2013-05-23 12:24:58
从工艺流程设计,聚集,水槽,塞住,倾吐和底下海豹捕猎混凝土和钢垂悬的箱子和高Zhuanggang垂悬的箱子建筑技术详细介绍了Tangshan transadmittance Chaohe河桥梁桩帽建筑的组合。
  • 匿名
2013-05-23 12:26:38
详细介绍了唐山 transadmittance 潮河桥梁桩帽施工,从工艺设计、 装配、 水槽、 堵、 浇筑和封底混凝土与钢挂框和高的 Zhuanggang 挂箱施工技术的组合。
  • 匿名
2013-05-23 12:28:18
Tangshan 跨接纳 Chaohe 河桥堆帽子建造的组合,从过程设计,集合,水槽,插入,倾泻和最后密封具体和钢铁悬挂盒子和悬挂盒的建造技术的高 Zhuanggang 详细地被介绍。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭