当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:从设计、拼装、下沉、堵漏、浇注封底混凝土及钢吊箱拆除等工序,对高桩钢吊箱施工技术作了详细的介绍。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
从设计、拼装、下沉、堵漏、浇注封底混凝土及钢吊箱拆除等工序,对高桩钢吊箱施工技术作了详细的介绍。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
From the design, and sink, blocking, and gate back concrete and steel swivel chassis removal operation, the high-pile steel swivel chassis construction technology made a detailed presentation.
  • 匿名
2013-05-23 12:24:58
From the design, assembling, the submersion, stops up leaks, the casting back cover concrete and the steel hangs working procedures and so on box demolition, hung the box construction technology to Gao Zhuanggang to make the detailed introduction.
  • 匿名
2013-05-23 12:26:38
From designing, assembling, sinks, leakage, pouring concrete and steel removed the back cover processes, high pile cofferdam construction technique introduced in detail.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭