关注:1
2013-05-23 12:21
求翻译:以唐山跨纳潮河大桥高桩承台的施工为例,从设计、拼装、下沉、堵漏、浇注封底混凝土及钢吊箱拆除等工序,对钢吊箱施工工艺作了详细的介绍。是什么意思?![]() ![]() 以唐山跨纳潮河大桥高桩承台的施工为例,从设计、拼装、下沉、堵漏、浇注封底混凝土及钢吊箱拆除等工序,对钢吊箱施工工艺作了详细的介绍。
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
Cross accepts the Chaohe River great height of a bridge relieving-type platform supported on piles take Tangshan the construction as the example, from the design, assembling, the submersion, stops up leaks, the casting back cover concrete and the steel hangs working procedures and so on box demoliti
|
|
2013-05-23 12:26:38
Tangshan, na Chao River-crossing bridge high pile bearing platform construction, for example, from designing, assembling, sinks, leakage, pouring concrete and steel removed the back cover and other processes for steel cofferdam construction technology introduced in detail.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区