|
关注:1
2013-05-23 12:21
求翻译:The hanging up of the door leaves is carried out with the crane provided by Skanska-Vinci HBwhen the door leaves where transported to the installation place. The door leaves can be lifted upas described in chapter 2.2 and be brought into the correct position是什么意思?![]() ![]() The hanging up of the door leaves is carried out with the crane provided by Skanska-Vinci HBwhen the door leaves where transported to the installation place. The door leaves can be lifted upas described in chapter 2.2 and be brought into the correct position
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
The hanging up of the door leaves is carried out with the crane provided by Skanska - Vinci HBwhen the door leaves where transported to the installation place. The door leaves can be lifted upas described in chapter 2.2 and be brought into the correct position
|
|
2013-05-23 12:24:58
The hanging up of the door leaves is carried out with the crane provided by Skanska-Vinci HBwhen the door leaves where transported to the installation place. The door leaves can be lifted upas described in chapter 2.2 and be brought into the correct position
|
|
2013-05-23 12:26:38
The hanging up of the door leaves is carried out with the crane provided by Skanska-Vinci HBwhen the door leaves where transported to the installation place. The door leaves can be lifted upas described in chapter 2.2 and be brought into the correct position
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区