|
关注:1
2013-05-23 12:21
求翻译:The hanging up of the door leaves is carried out with the crane provided by Skanska-Vinci HB when the door leaves where transported to the installation place. The door leaves can be lifted upas described in chapter 2.2 and be brought into the correct position是什么意思?![]() ![]() The hanging up of the door leaves is carried out with the crane provided by Skanska-Vinci HB when the door leaves where transported to the installation place. The door leaves can be lifted upas described in chapter 2.2 and be brought into the correct position
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区