|
关注:1
2013-05-23 12:21
求翻译:模拟菱形挂篮在浇筑过程中的实际受力状态,从而得出三角形挂篮各部位的变形数据,绘出挂篮荷载—变形曲线得出相同荷载下的挂篮变形,是什么意思? 待解决
悬赏分:1
- 离问题结束还有
模拟菱形挂篮在浇筑过程中的实际受力状态,从而得出三角形挂篮各部位的变形数据,绘出挂篮荷载—变形曲线得出相同荷载下的挂篮变形,
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
Simulated diamond hanging basket has been poured in the actual load status so as to arrive at 3 corner-shaped hanging basket the site of the deformation data, to map the hanging basket load-deformation curves have come to the same load of the hanging basket is deformed.
|
|
2013-05-23 12:24:58
The simulation diamond hangs the basket in construction process actual stressful condition, thus obtains the triangle to hang the basket various spots the distortion data, draws hangs the basket load - distortion curve to obtain under the same load to hang the basket distortion,
|
|
2013-05-23 12:26:38
Simulation of rhombic hanging basket in actual stress in the casting process, to draw different parts of triangle hanging basket deformation data, draw a basket load-deformation curve of the same basket deformation under load,
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区