当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Construction of a lake water intake and water intake pump station on the shore of Lake Albert to the beach, and a water transfer pipeline to the CPF. The water intake device, water transfer line and water treatment facilities shall be sized to accommodate the water requirements for the whole production life period;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Construction of a lake water intake and water intake pump station on the shore of Lake Albert to the beach, and a water transfer pipeline to the CPF. The water intake device, water transfer line and water treatment facilities shall be sized to accommodate the water requirements for the whole production life period;
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭