|
关注:1
2013-05-23 12:21
求翻译:在任何情况下,在比基础或最上面永久固定楼面高四层或15 米的位置不得有未完成的栓接和焊接工作是什么意思? 待解决
悬赏分:1
- 离问题结束还有
在任何情况下,在比基础或最上面永久固定楼面高四层或15 米的位置不得有未完成的栓接和焊接工作
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
In any case, the base or the top permanently fixed floor high-tier 4 or 15 meters of the location may not have not completed the bolted and welded work
|
|
2013-05-23 12:24:58
In any situation, in either most above the permanent fixed floor high four or 15 meter positions must not have the bolting and the welding work compared to the foundation which has not completed
|
|
2013-05-23 12:26:38
In any case, the basis or permanently fixed on the top four-storey buildings location should have unfinished or 15 meters of bolting and welding
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区