|
关注:1
2013-05-23 12:21
求翻译:主河槽底部孤块石及淤积土全部挖除至基岩面是什么意思? 待解决
悬赏分:1
- 离问题结束还有
主河槽底部孤块石及淤积土全部挖除至基岩面
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
The river bottom slot lone stone and siltation and dredging all inter alia to the bedrock
|
|
2013-05-23 12:24:58
The master river tank bottom department orphaned rubble stone and the silt fill dig completely eliminate to the bedrock surface
|
|
2013-05-23 12:26:38
Main channel isolated rock at the bottom and all removed the alluvial soil to bedrock surface
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区