当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Start up will be made either with the material that will be supplied by Hytech or in case components are missed De Nora India will buy the required material for the trial from your standard supplier (De Nora India request is to produce during start up 5 km of material)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Start up will be made either with the material that will be supplied by Hytech or in case components are missed De Nora India will buy the required material for the trial from your standard supplier (De Nora India request is to produce during start up 5 km of material)
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
“Start(开始)”将会取得的材料或将提供的hytech或组件是错过了DE Nora印度将购买所需材料,从您的审判标准供应商(De Nora印度请求是产生在启动5公里的材料)
  • 匿名
2013-05-23 12:24:58
开始将组成二者之一与将由Hytech提供或的材料,万一组分被错过De Nora ・印度将买必需的材料为试验从您的标准供应商 (De Nora印度请求是生产在期间开始5公里材料)
  • 匿名
2013-05-23 12:26:38
将提出启动,或者将由海天提供的材料或在分量缺失的情况下德诺拉印度将购买所需的材料的审判从你标准的供应商 (德诺拉印度要求,是要在 5 公里长的材料的启动过程中产生)
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭