当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Where an LV MCC is present in the substation, the feeder to the distribution board will be from a bay in the MCC. Where no LV process loads are fed from the substation and an existing supply is not available on site, an appropriately sized LV transformer will be installed to supply the Light and Power requirements.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Where an LV MCC is present in the substation, the feeder to the distribution board will be from a bay in the MCC. Where no LV process loads are fed from the substation and an existing supply is not available on site, an appropriately sized LV transformer will be installed to supply the Light and Power requirements.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待... 正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
其中,一个LV MCC在变电站,进纸器,配电板将从一个托架在MCC。 在没有LV进程加载进变电站和现有供应是站点上不可用,大小适当的LV变压器将被安装到电源指示灯和电源要求。
  • 匿名
2013-05-23 12:24:58
那里LV MCC是存在分站,饲养者对配电屏将是从一个海湾在MCC。 那里LV处理装载没有从分站哺养,并且现有的供应不是可利用的在站点,将安装一台适当地大小的LV变压器供应光和功率需要量。
  • 匿名
2013-05-23 12:26:38
LV MCC 在哪里目前变电站,配电板料将从 MCC 湾。哪里没有 LV 过程荷载美联储从变电站和现有的供应不是可用的网站上,将安装一个适当大小的 LV 变压器供应的光与电的要求。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待... 正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭