|
关注:1
2013-05-23 12:21
求翻译:Dredge needs to be 75meters long approximately 12 meters wide approximately 4 meters high, behind the dredge will be a tail barge 44 meters long a spud carriage hyd operated both for lifting the spud and advancing the dredge, this spud carriage will house the digging spud well, and hyd cylinders to lift the digging spu是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Dredge needs to be 75meters long approximately 12 meters wide approximately 4 meters high, behind the dredge will be a tail barge 44 meters long a spud carriage hyd operated both for lifting the spud and advancing the dredge, this spud carriage will house the digging spud well, and hyd cylinders to lift the digging spu
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
发掘需要大约75米长12米宽约4米多高的背后,发掘将是一个尾部插入44米长一个定位笔架路政署营运这两起定位和推进的发掘,这种定位笔架将内部的挖掘和定位,和路政署油缸,将挖掘定位。
|
|
2013-05-23 12:24:58
挖泥机长期需要是75meters大约12米宽大约4米高,在挖泥机之后将是44米长spud支架动水学操作两个为举spud的尾巴驳船,并且推进挖泥机,这个spud支架将很好安置开掘的spud和动水学圆筒举开掘的spud。
|
|
2013-05-23 12:26:38
疏浚需要 75 米长约 12 米宽大约高 4 米,背后挖泥船将尾巴驳船 44 米长开钻马车路政署运作都解除了马铃薯和推进疏通,此车将好,房子挖开钻和路政署气瓶解除了挖马铃薯。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区