|
关注:1
2013-05-23 12:21
求翻译:The project consists of the extension of 230kv substation and the construction of a double circuit transmission line with a length of 129km.是什么意思? 待解决
悬赏分:1
- 离问题结束还有
The project consists of the extension of 230kv substation and the construction of a double circuit transmission line with a length of 129km.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区