当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Therefore, the release of P at 12 m must be low. The maximum TP and DP removal rates of the two constructed wetlands were observed at a 10 d interval, that is, the constructed wetlands could improve their P removal capacity after a long period of “rest” (Hammer and Knight 1994)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Therefore, the release of P at 12 m must be low. The maximum TP and DP removal rates of the two constructed wetlands were observed at a 10 d interval, that is, the constructed wetlands could improve their P removal capacity after a long period of “rest” (Hammer and Knight 1994)
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
因此,发布的P12m必须为低电平。 最大TP的去除率和DP的湿地的两个建造在一个10D时间间隔,即湿地的建设可以提高其能力p去除后一个长时期的“休息”(锤子和骑士1994)
  • 匿名
2013-05-23 12:24:58
所以, P发行在12 m一定是低的。 二片被修建的沼泽地的最大值TP和DP撤除率被观察了在10 d间隔时间,即,被修建的沼泽地可能在“休息”锤子的长期和骑士以后改进他们的 (P撤除容量1994年)
  • 匿名
2013-05-23 12:26:38
因此,P 发布会 12 m 必须是低的。两种人工湿地最大的茶多酚和 DP 去除率观察的时间间隔 10 d,那就是,人工的湿地可以提高其 P 去除能力经过长时间的"休息"(锤和骑士 1994 年)
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭