|
关注:1
2013-05-23 12:21
求翻译:No pipes shall be laid, nor lower bedding placed, until the formation has been inspected by the Engineer. The Contractor shall provide to the Engineer, a weekly schedule in advance indicating the dates and approximate times he expects to request such inspections是什么意思?![]() ![]() No pipes shall be laid, nor lower bedding placed, until the formation has been inspected by the Engineer. The Contractor shall provide to the Engineer, a weekly schedule in advance indicating the dates and approximate times he expects to request such inspections
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区