|
关注:1
2013-05-23 12:21
求翻译:爭取盡快完成西貢公路第一期改善工程,並落實第二期改善工程的詳細設計方案,以紓緩西貢公路交通擠塞的情況。是什么意思?![]() ![]() 爭取盡快完成西貢公路第一期改善工程,並落實第二期改善工程的詳細設計方案,以紓緩西貢公路交通擠塞的情況。
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
Get complete as soon as possible west 貢 highway first cycle improve engineering, and meet the second cycle improve engineering the detailed design for relief west 貢 highway traffic into the situation.
|
|
2013-05-23 12:24:58
Strives for as soon as possible completes the hiram's highway first issue of betterment work, and carries out the second issue of betterment work the detailed design proposal, relieves the hiram's highway transportation pack the situation.
|
|
2013-05-23 12:26:38
正在翻译,请等待...
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区