当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:ite location (coordinates), identification of the drilling and completion date of commencement of drilling, work number, name of driller, rig type used, method of advancing the drilling drum sampling information, diameter and depth at which it was installed the shirt, lifting (including the reference level used) of the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
ite location (coordinates), identification of the drilling and completion date of commencement of drilling, work number, name of driller, rig type used, method of advancing the drilling drum sampling information, diameter and depth at which it was installed the shirt, lifting (including the reference level used) of the
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Ite 的位置 ( 坐标 ) , 确定钻孔和完成日期的开始钻井、工作编号、名称钻井工、钻机类型使用的方法、提高钻孔成像鼓的采样信息、直径和深度上安装了它的衬衫、解除 ( 包括参考级用 ) 的土地表面的“站点调查”。
  • 匿名
2013-05-23 12:24:58
ite (它)安装衬衣的地点钻井的开始钻井和完成日期的座标、证明,工作缵孔者的数字、名字,在勘址使用的,方法,直径和深度,举包括假定水准基点 (使用土地表面) 船具推进钻鼓采样信息类型。
  • 匿名
2013-05-23 12:26:38
ite 位置 (坐标),识别的钻井和完井的钻井工作号码,司钻,名称生效日期钻机使用的类型、 方法推进钻井鼓采样信息、 直径和深度,它是在现场勘察的土地表面安装这件衬衫,解除 (包括水平使用的引用)。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭