|
关注:1
2013-05-23 12:21
求翻译:Excavating from approved borrow pit.Haul excavated material not exceeding 1km, deposit,spread in 150mm layers and compact to 100% BS compaction as filling on carriageway or shoulder for embankments and trim slopes to required cross section . All measure as complete work in final situ.是什么意思?![]() ![]() Excavating from approved borrow pit.Haul excavated material not exceeding 1km, deposit,spread in 150mm layers and compact to 100% BS compaction as filling on carriageway or shoulder for embankments and trim slopes to required cross section . All measure as complete work in final situ.
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
挖掘从批准的借用坑中长途挖出的材料不超过 1 公里 , 存款 , 分布在 150 mm 的图层和紧凑型 100 % BS 压缩如填上行车道或肩部的堤坝和调整斜坡所需的交叉部分。 所有的措施为完成工作 , 最后的现场。
|
|
2013-05-23 12:24:58
挖掘从批准的取土坑。拖拉被挖掘的材料不超出1km,放置,传播在150mm层数和协定到100% BS击实如填装在车道或肩膀为堤防并且整理倾斜到必需的横断面。 所有措施作为完全工作在最后的situ。
|
|
2013-05-23 12:26:38
从挖掘批准借坑。重载出土的材料不超过 1 公里、 存款、 150 毫米分层摊铺在压缩到 100 %bs 压实作为填充行车道或肩膀的河堤和所需的截面修剪山坡上。作为完整的工作,最后现场的所有措施。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区