|
关注:1
2013-05-23 12:21
求翻译:The time period shall commence from the date on which SGS or Saybolt has ascertained the quantity and quality of the first batch discharged at the Seller's designated discharge terminal facilities.是什么意思?![]() ![]() The time period shall commence from the date on which SGS or Saybolt has ascertained the quantity and quality of the first batch discharged at the Seller's designated discharge terminal facilities.
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区