当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Each crane installation, including the crane supply conductors, connected to an external power supply shall be provided with a main isolator that complies with Clause 8.10.3.4, to enable isolation of the crane installation from the power supply. The isolator shall be located in a readily accessible place, adjacent to t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Each crane installation, including the crane supply conductors, connected to an external power supply shall be provided with a main isolator that complies with Clause 8.10.3.4, to enable isolation of the crane installation from the power supply. The isolator shall be located in a readily accessible place, adjacent to t
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
每个起重机安装 , 包括起重机供应导线连接至外部电源应提供主要的隔离器 , 符合条款 8.10 中 3.4 , 使孤立的起重机安装的电源。 隔离器应设在便于访问的位置 , 毗邻常用的泊车或保养位置之一的白鹤 , 或其他容易访问的位置。
  • 匿名
2013-05-23 12:24:58
每起重机设施,包括起重机供应指挥,连接到外部电源提供将带有遵照条目8.10.3.4的一个主要绝缘物,使能起重机设施的隔离从电源。 绝缘物将位于一个欣然容易接近的地方,在通常停车处或服务位置其中一台附近起重机,或者某一其他欣然容易接近的地方。 在这样事例,绝缘物的地点将由一个适当的通知表示在起重机的通常停车处或服务地点。
  • 匿名
2013-05-23 12:26:38
每个起重机安装,包括连接到外部电源供电的起重机供应导体须备有符合条款 8.10.3.4,启用起重机安装从电源隔离主要隔离器。隔振器应位于易于存取的地方,毗邻通常停车或服务位置之一的起重机,或在一些其他易于存取的地方。在这种情况下,应由通常停车或维修起重机的位置适当通知表示隔振器的位置。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭