当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:we use the Tail barge to hold Booster pump, spud carriage, and storage for the dredge as well as Room for any thing that room is needed for to assist the dredge operation, please ask your engineers to give me a small drawing just to show there concept of what the dredge will look like是什么意思?

待解决 悬赏分:1 - 离问题结束还有
we use the Tail barge to hold Booster pump, spud carriage, and storage for the dredge as well as Room for any thing that room is needed for to assist the dredge operation, please ask your engineers to give me a small drawing just to show there concept of what the dredge will look like
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
我们使用尾部插入到保持增压泵、定位架、和存储的发掘以及房间的任何事情 , 房所需要的协助发掘操作 , 请询问您的工程师给我一小图只显示有概念的发掘将看起来像
  • 匿名
2013-05-23 12:24:58
我们使用尾巴驳船举行前置泵、spud挖泥机的支架和存贮以及室为所有事室是需要的为协助挖泥机操作,请要求您的工程师给我一张小图画什么的展示那里概念挖泥机将看似
  • 匿名
2013-05-23 12:26:38
我们使用尾巴驳船举行增压泵、 开钻运输和存储挖泥船以及房间需协助疏通操作,任何事情的余地请询问您的工程师给我一个小的绘图,只是为了显示那里什么疏通的概念将会看起来像
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭