|
关注:1
2013-05-23 12:21
求翻译:Backed by the positive simulation results, Wuhan implemented its first formal channelization at the intersection of Xinhua Road and Jianshe Avenue in 2001. According to the TMB, traffic capacity at the intersection increased by 75 percent from 4,000 vehicles per hour to 7,000 vehicles per hour after channelization, alt是什么意思?![]() ![]() Backed by the positive simulation results, Wuhan implemented its first formal channelization at the intersection of Xinhua Road and Jianshe Avenue in 2001. According to the TMB, traffic capacity at the intersection increased by 75 percent from 4,000 vehicles per hour to 7,000 vehicles per hour after channelization, alt
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
由正面模仿结果支持, 2001年Wuhan实施了它的第一正式管道化在Xinhua路和建设大道的交叉点。 根据TMB,交通容量在交叉点增加了75%从每个小时4,000辆车到每个小时7,000辆车在管道化以后,虽然细节不是可得到从TMB或设计学院。 许多赌金保管人包括TMB最初有关管道化从机动车将拿走路空间 (看图1b和1c)。 这早成功是重要对管道化的普遍采用。 副市长也参观了站点,支持管道化公开和命令相关代办处前进。
|
|
2013-05-23 12:26:38
武汉的支持下积极的仿真结果,执行其第一次正式渠化路口的新华路、 建设大道 2001 年。根据 TMB,增加了 75%,从每小时 4000 辆车辆到 7000 辆车每小时后渠,尽管细节仍未可从 TMB 或设计院路口通行能力。许多利益相关者包括 TMB 最初担心,该渠会带走道路空间从机动车辆 (见图 1b 和 1c)。这个早期的成功是重要的渠化的广泛采用。副市长还访问了网站,赞同渠在公共场合和订购相关的机构共同努力,继续前进。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区