|
关注:1
2013-05-23 12:21
求翻译:To prepare the Wind Up Station foundation by cutting and digging the concrete 60mm deep x the size in the drawing. Please refer Drawing No.: ENG-0267021 and see also "S" and "G - G".是什么意思? 待解决
悬赏分:1
- 离问题结束还有
To prepare the Wind Up Station foundation by cutting and digging the concrete 60mm deep x the size in the drawing. Please refer Drawing No.: ENG-0267021 and see also "S" and "G - G".
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区