当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:We have considered 3-phase fault in the immediate vicinity of the Solar Power Plant i.e. right at the 132 kV bus bar of the solar power plant substation, cleared in 9 cycles, as normal clearing time for 132 kV i.e. 180 ms, followed by permanent trip of 132 kV single circuit connected to this substation是什么意思?

待解决 悬赏分:1 - 离问题结束还有
We have considered 3-phase fault in the immediate vicinity of the Solar Power Plant i.e. right at the 132 kV bus bar of the solar power plant substation, cleared in 9 cycles, as normal clearing time for 132 kV i.e. 180 ms, followed by permanent trip of 132 kV single circuit connected to this substation
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
我们审议了第 3 阶段的故障的附近的太阳能发电厂即在 132 kV 母线的太阳能发电厂变电站、清除了 9 个周期 , 如正常的结算时间为 132 kV 即 180 ms 、其次是永久的里程为 132 kV 单回路连接到该变电站
  • 匿名
2013-05-23 12:24:58
我们在太阳能植物的临近地区考虑了3-phase缺点即。 正确在太阳能植物分站的132千伏母线,清除在9个周期,作为正常清洁时间为132千伏即。 180女士,跟随由132千伏永久旅行选拔电路连接到这个分站
  • 匿名
2013-05-23 12:26:38
我们考虑在紧邻的太阳能发电厂的 3 相故障即右拐 132 kV 母线的太阳能发电厂变电站,清除在 9 个周期,作为正常结算时间为 132 kV 即 180 ms,其次是常任理事国旅行的 132 kV 单回路连接到此变电站
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭