|
关注:1
2013-05-23 12:21
求翻译:Nevertheless, the development project of Elegest black coal as a part of railway construction towards the territory of Republic was not declined and in April 2013 Tuva Energy Industrial Corporation (TEIC), headed by Baysarov R.S., acquired the license for the 20-year field development period. At the beginning of 2014 T是什么意思? 待解决
悬赏分:1
- 离问题结束还有
Nevertheless, the development project of Elegest black coal as a part of railway construction towards the territory of Republic was not declined and in April 2013 Tuva Energy Industrial Corporation (TEIC), headed by Baysarov R.S., acquired the license for the 20-year field development period. At the beginning of 2014 T
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
然而 , 发展项目的黑色 Elegest 煤炭作为铁路建设的领土的共和国并未有所下降 , 在 2013 年 4 月图瓦能源工业公司 ( TEIC ) 由 Baysarov R 221.10 , 获得许可的 20 年的外地的发展时期。
|
|
2013-05-23 12:24:58
然而, Elegest黑煤炭发展项目作为铁路建筑的部分往共和国疆土在Energy 4月2013年Tuva Industrial Corporation TEIC未下降 (和),由Baysarov R.S.带领,获取了20年领域发展期间的执照。 在通过第一个资格阶段的2014 TEIC初为使用投资从全国福利资助 (NWF) 为出资包括Kuragino-Kyzyl铁路建筑的联合项目作为Elegest煤田发展的部分并且Vanino海港建造计划。 项目的总价值估计在217.2 bln。 卢布,而共同资金从NWF资金将做40%,即。 86.9 bln。 卢布,被借用的资金- 35%,拥有的资金- 25%
|
|
2013-05-23 12:26:38
不过,格斯黑煤作为铁路建设对共和国领土的一部分的发展项目拒绝并不在 2013 年 4 月图瓦能源工业公司 (TEIC),由 Baysarov R.S.获得许可证 20 年领域发展的时期。在 2014 年开始 TEIC 通过了第一次资格阶段使用的投资从国家福利基金 (野生) 共同筹资,综合的项目包括 Kuragino-克孜勒铁路建设作为格斯煤田开发以及瓦尼诺海港口建设项目的一部分。项目的总价值估计为 217.2 亿美元。卢布,而共同筹资从野生动物协会的资金将使 40%,即 86.9 亿。卢布,借来的资金 — — 35%,自有的资金 — — 25%[10]。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区