当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Contractor shall be responsible for the standardization of all small mechanical and electrical equipment, materials and device for the works. He shall arrange and perform the necessary coordination work with his subcontractors for the purpose of such standardization, such equipment, devices, fittings, etc. shall co是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall be responsible for the standardization of all small mechanical and electrical equipment, materials and device for the works. He shall arrange and perform the necessary coordination work with his subcontractors for the purpose of such standardization, such equipment, devices, fittings, etc. shall co
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
承包商应负责的标准化 , 所有小的机械和电气设备、材料和设备的工作原理。 他应安排和执行必要的协调与他的分包商的目的 , 这种标准化 , 例如设备、设备、配件等应包括但不一定限于以下内容 :
  • 匿名
2013-05-23 12:24:58
承包商将负责对所有小机械和电机设备、材料和设备的标准化为工作。 他将安排并且进行必要的协调工作与他的转承包商为这样标准化、这样设备、设备、配件等等的目的。 将包括,但不必要限于以下:
  • 匿名
2013-05-23 12:26:38
承包商应负责所有的小机械和电气设备、 材料和工程设备的标准化。他应安排和执行必要的协调工作,他为这种标准化,这种设备,设备,配件的分包商,等包括,但不是一定限于以下内容:
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭