|
关注:1
2013-05-23 12:21
求翻译:In the drainage Component, based on in-depth Studies of Hydrology made pre Design considers the implementation of Conventional devices of surface Drainage, transverse and longitudinal Designs raised with specific recommendations for their proper execution, ensuring a proper functioning, which has clearly established th是什么意思?![]() ![]() In the drainage Component, based on in-depth Studies of Hydrology made pre Design considers the implementation of Conventional devices of surface Drainage, transverse and longitudinal Designs raised with specific recommendations for their proper execution, ensuring a proper functioning, which has clearly established th
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
在排水组件、基于深入的研究 , 作出了水文预设计应考虑执行的传统设备的表面排水、横向和纵向的设计提出了具体建议。它们的正确执行 , 确保正常运转 , 明确地确立了重要的排水组件在项目中 , 由于高水平的降雨量发生在该地区的双轨道。
|
|
2013-05-23 12:24:58
在排水设备组分,根据水文学做的前设计的深入的研究考虑表面排水设备,横向和纵向设计常规设备的实施上升以对他们适当的施行的具体推荐,保证一适当起作用,在项目清楚地建立了重要性排水设备组分给出降雨量发生在区域的高水平双轨。
|
|
2013-05-23 12:26:38
在组件,基于水文深入研究了预排水设计认为执行常规设备的地面排水,横向和纵向设计提出具体的建议,为他们正确的执行,确保正常的运作,显然已重要性与排水组件在项目中,给出了降雨的双轨地区发生的高水平。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区