求翻译:(3)Handover inspection: when the construction teams involved in previous and next processes consider compliance with the requirements of item project quality acceptance standards through mutual inspection, the construction of the next process can commence after handover inspection records are filled in by both sides an是什么意思?

待解决 悬赏分:1 - 离问题结束还有
(3)Handover inspection: when the construction teams involved in previous and next processes consider compliance with the requirements of item project quality acceptance standards through mutual inspection, the construction of the next process can commence after handover inspection records are filled in by both sides an
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
( 3 ) 交接检查 : 当施工队参与上一页和下一流程考虑符合要求的项目工程质量验收标准通过相互检查、建造的下一进程能够开始在政权移交后的检查记录的填写 , 双方并签署了领班的分包商。
  • 匿名
2013-05-23 12:24:58
(3) Handover检查: 当在早先和下个过程介入的建筑队通过相互检查时考虑遵照项目项目质量采纳标准的要求,下个过程的建筑可能开始,在handover检查纪录由双方填装并且由转承包商的工头之后签字。
  • 匿名
2013-05-23 12:26:38
() 3交接检: 当上一页和下一页的流程中涉及的施工队考虑遵守要求的项目工程质量验收标准通过互检下, 一道工序可以动工后交接检验记录都是由双方填写和签署的分包商的工头。