求翻译:  雨水斗安装在混凝土屋面预留好的洞位置,横向位置在天沟中央,横向偏移误差≤10毫米,纵向位置按照定位图定位,纵向偏移≤10毫米。钢天沟雨水斗安装,钢天沟上开洞为280+5mm的方形,氩弧焊接。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
  雨水斗安装在混凝土屋面预留好的洞位置,横向位置在天沟中央,横向偏移误差≤10毫米,纵向位置按照定位图定位,纵向偏移≤10毫米。钢天沟雨水斗安装,钢天沟上开洞为280+5mm的方形,氩弧焊接。
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
Geberit is installed in concrete roof reserved good location, lateral position of the hole in the center of the groove Lateral Offset Error ≤10 mm, in accordance with the position it longitudinal position positioning, longitudinal offset ≤10 mm. Steel Groove Geberit, steel groove on the opening of t
  • 匿名
2013-05-23 12:24:58
The rain sink installs the hole position which reserves in the concrete roofing, lateral attitude in drain gutter central committee, crosswise offset error ≤10 millimeter, longitudinal position according to location map localization, longitudinal displacement ≤10 millimeter.The steel drain gutter ra
  • 匿名
2013-05-23 12:26:38
Water bucket installed in a hole in the concrete roof reserve position, horizontal position in the middle of the gutter, lateral offset error of ≤ 10 mm, longitudinal positioning under the location map, longitudinal ≤ 10 mm offset. Steel rain gutter install and open holes in the gutters for the 280+
  • 匿名
2013-05-23 12:28:18
null
 
 