求翻译:This test may be conducted including the alarm check valve body or just using the trim piping. In either case, the items under test shall be filled with water making sure to remove all internal air. The component shall then be subjected to a hydrostatic test pressure of twice the rated working pressure for a duration o是什么意思?![]() ![]() This test may be conducted including the alarm check valve body or just using the trim piping. In either case, the items under test shall be filled with water making sure to remove all internal air. The component shall then be subjected to a hydrostatic test pressure of twice the rated working pressure for a duration o
问题补充: |
|
2013-05-23 12:21:38
null
|
|
2013-05-23 12:23:18
此测试可进行包括报警检查阀体或仅使用调整的管道。 在任一情况下 , 项目的测试应注满水并确保要删除所有内部的空气。 该组件应随后将静液压试验压力为 2 倍额定工作压力的持续时间为 5 分钟。 最小压力测试的测试应为 350 磅 平方英寸 ( 2415 千帕 ) 。
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
这次试验可能进行包括报警检查阀体或只使用修剪的管道。在任一情况下,根据测试项目应装满水并确保删除所有内部空气。该组件然后应遭受持续时间为五分钟的水压试验压力的两倍额定工作压力。这次考试的最低试验压力应 350 磅 (2415年千帕)。应无可见的破裂,开裂,或永久变形到任何组件的修剪管道经过这个试验。
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区